AC插头模具

Categories of news

Product Categories

contact us

Dongguan Haochen Mould Factory

Contact: Mr. Li

Mobile phone: 0086+13922512135

Q Q: 89180037

Q Q: 2649528748

Phone: 0086769-83511708

Phone: 0086769-83511798

Fax: 0086769-83511508

Email: liwei@haochenmj.com

Website: www.haochenmj.com/en

Address: No. 58, Lishi Industrial Zone, Huangjiang Town, Dongguan City


How is the data cable plug mold displayed?

Your current location: Home >> News >> Common Problem

How is the data cable plug mold displayed?

Date:2019-06-18 Author: Click:

The data line plug mold is a model, and the product is made according to this model, but how does the mold come out? Perhaps most of the answers except for mold professionals are not available. Molds have already played a role in our days, and most of our daily necessities are inseparable from molds, such as computers, telephones, fax machines, keyboards, cups and other plastic products. Needless to say, other like The outer covers of automobiles and motorcycle engines are also made of molds, and more than 20,000 molds are needed for a car. So the effect of modern day molds cannot be replaced. Only mass production is inseparable from the mold.


   So how is the mold made?


  The following is a brief introduction to the production process of modern molds.


1) ESI (Earlier Supplier Evolvement pre-supplier participation): This stage is mainly about the technical discussions between customers and suppliers on product planning and mold development, etc. The primary purpose is to let the supplier clearly Understand the planning purpose and precision requirements of the product planner, and also let the product planner better understand the ability of the mold production, the process performance of the product, and then make a more reasonable plan.


   2) Quotation (Quotation): Including the price of the mold, the life of the mold, the turnover process, the tonnage required by the machine, and the delivery time of the mold. (More specific quotation should include standard product weight, mold standard weight, etc.)


数据线插头模具

3) Order (Purchase Order): Customer order, deposit announcement and supplier order acceptance.


   4) Mold production plan and schedule arrangement (Production Planning and Schedule Arrangement): At this stage, the customer needs to reply to the specific date of mold delivery.


   5) Mold planning (Design): Probably the planning software used is Pro/Engineer, UG, Solidworks, AutoCAD, CATIA, etc.


   6) Acquisition information


7) Machining: The processes involved are roughly turning, gong (milling), heat treatment, grinding, computer gong (CNC), electric spark (EDM), wire cutting (WEDM), coordinate grinding (JIG GRINGING), Laser lettering, polishing, etc.


   8) Mold assembly (Assembly)


   9) Trial Run


   10) Model Comments Chen Shuo (SER)


  11) Sample reviews of Chen Approval (SER Approval)



Tags:Datacableplugmold,Dongguandatacableplugmold,datacableplugmoldmanufacturer

About Haochen
Contact us

image.pngPhone: 0086769-83511708 / 0086-13922512135

image.pngEmail: liwei@haochenmj.com

image.pngAddress: No. 58, Lishi Industrial Zone, Huangjiang

        Town, Dongguan City


        扫一扫,查看手机

热推产品  |  主营区域: 浙江 广西 武汉 湖南 北京 上海 河北 山东 广东 江苏
Share
Welcome to leave message
Please enter the message here, we will contact you as soon as possible.
Name
Contacts
Phone
Phone
Email
Email
Address
Address