What does the AC plug mold forming process mean?
Batching and molding trial production When batching, on the one hand, the special use of the desulfurization agent must be considered, on the other hand, the molding performance of the material must be coordinated, and a suitable molding die should be selected. Although the more honeycomb holes, the surface area of the product is 241) coal-fired furnace; 2) cooling water tank; 3) pillar; 4) dust collector; 5) steady flow tube; 6) measuring hole; 7) water spray pipe network; 8) Desulfurization chamber; 9) Air volume adjustment valve; 10) The larger the induced draft fan, the larger the contact area between the desulfurization agent and SO2.
Experimental materials mainly include calcium materials and plasticizers. Calcium materials are limestone and lime. Limestone contains more than 395% of CaCO and lime contains about 90% of CaO. Plasticizers include natural inorganic materials and organic chemical materials (domestic).
Process and main parameters First, crush large chunks of lime (or limestone), put them into a ball mill and grind them, take them out when the fineness reaches the requirements, then put them in water for hydration and precipitation treatment, and then rub them into small balls , Put it in the electric drying box to dry; then, according to the requirements of the formula, weigh the prepared mud and plasticizer separately, participate in the mixing mill in the ball mill together, and discharge after the homogenization, and then pour it into the mixing machine Inside, according to the ratio of 18% to 28% of the formed moisture, add water while mixing and mixing. After mixing and evenly transfer to the aging tank for aging treatment to further homogenize the water and the mud, and then the mud after repeated homogenization Feed into the barrel of the molding machine (a special honeycomb structure molding die is installed at the barrel outlet before loading), start the hydraulic machine to pressurize the mud, the mud is forced to be extruded, and the mud flows through the mold Shear and stick to become a wet billet of honeycomb structure, and then cut, natural pre-drying, electric heating drying is the product.